This is a bit better than mold manufacturing companies.

This settlement method is basically the same as the first settlement method. It is only a 10% increase in prepayment. This is a bit better than mold manufacturing companies. (3) “Three-four-three-three” settlement: that is, the date when the contract is signed, that is, 30% of the pre-paid model price, etc., and participate in the design review, the mold materials are in place, and 40% of the model price is paid when processing begins. The remaining 30%, after the mold is qualified for delivery, it will be paid within one week. This kind of settlement method is currently a popular one. The main features of this settlement method are as follows: 1) The 30% model price prepaid in the first period is used as the deposit.  2) According to the review, check the progress and reliability, carry out the second 40% payment, and strengthen the supervision of the mold manufacturing progress. 3) 30% of the balance, after the mold acceptance is passed, after a few days of use, settle the balance.

This way, the design runs close to the mold and is used in synchronous operation.  4) In case the mold fails, the mold manufacturer, in addition to returning all the advance payment, will also pay compensation. The compensation is generally 1-2 times the deposit. The method of adding value for the mold cost of extracting the production profit of the workpiece: that is, when the mold is designed and manufactured, the mold user only needs to invest a small amount to air cooler mould  ensure the basic cost of the mold manufacturing (or no need to pay the mold fee at all). .

After the mold manufacturing is delivered and used, the production of the parts is started, and a part of the profit is returned to the mold maker for each part of the production of the parts, as the mold fee. In this way, the mold manufacturer and the user are organically linked to form profit integration, closely linking investment risks and use benefits, and fully linking technology and economy, quality and production efficiency. It also maximizes the value and risk of the mold. This approach is currently a trend of horizontal linkage. Its main features are: give full play to the advantages of mold makers and mold users.

0コメント

  • 1000 / 1000